Login

Reports/Maps

Preferred Alternative Map, October 2009:

Preferred Alternative Detail Maps, October 2009:

Supplemental Draft Environmental Impact Statement:

Chapters:

Appendices:

Section 4(f) Evaluation:

Technical Reports:


Some files contain aerial photographs and may take several minutes to download (depending on your connection speed). Sizes range from 1 - 8 megabytes.

Current Design Alternatives being studied in supplemental draft EIS:

Past Maps

May/June 2005 Draft Concepts

These draft concepts will be further refined and taken to the PAC in August and to a public open house in September. We anticipate that a recommendation on which alternatives to further study in the Supplemental Draft EIS will be made in October 2005.

Reference Maps, Photos and Reports

March 2005 Aerial Photos from ODOT Photo and Video Services

Photos 1A-6A are of the pinchpoint at the bluff / mid-section area.

1A 2A
3A



4A 5A
6A
Photos 7A-12A are of the Rock Creek Junction Area.



7A 8A
9A



10A 11A 12A

PDFs

Environmental Baseline Report

Project Area

Project Area Map



(top of page)